[1] Tao S, Wu C*, Hu S, & Xu F. Construction project schedulingunder workspace interference. Computer‐Aided Civil and Infrastructure Engineering, 2020, 35(9): 923-946. (SCI,分区: 中科院1区,影响因子: 6.208)
[2] Tao S, Wu C Z*, Sheng Z H, Wang X Y. Stochastic project scheduling withhierarchical alternatives. Applied Mathematical Modelling, 2018, 58: 181-202.(SCI, 分区: Q1, 影响因子: 2.617)
[3] Tao S, Wu C Z*, Sheng Z H, Wang X Y. Space-time repetitive projectscheduling considering location and congestion. Journal of Computing in CivilEngineering, 2018, 32(3): 04018017. (SCI, 分区: Q2, 影响因子: 1.798)
[4] Tao S, Dong Z S*. Multi-mode resource-constrained project schedulingproblem with alternative project structures, Computers & IndustrialEngineering, 2018, 125: 333-347. (SCI, 分区: Q1, 影响因子: 3.195)
[5] Tao S, Dong Z S*. Scheduling resource-constrained project problem withalternative activity chains. Computers & Industrial Engineering, 2017, 114:288-296. (SCI, 分区: Q1, 影响因子: 3.195)
[6] 陶莎, 盛昭瀚, 时茜茜. 基于主体自治的项目群调度协同优化. 系统管理学报, 2019(02):259-268. (CSSCI, 影响因子: 1.594)
[7] 陶莎, 盛昭瀚, 徐峰. 项目调度与多尺度资源配置集成优化. 管理工程学报, 2018,32(1): 204-211. (CSSCI, 影响因子: 2.906)
[8] 陶莎, 盛昭瀚. 带有多重空间干涉约束的工程调度优化. 系统管理学报, 2018, 1: 64-71. (CSSCI, 影响因子: 1.594)
[9] 陶莎, 盛昭瀚, 朱建波. 交互作用不确定下的项目组合选择鲁棒决策. 中国管理科学, 2017, 4:190-196. (CSSCI, 影响因子: 3.661)
[10] 陶莎, 胡志华, 盛昭瀚. 基于关键资源优先的三级装卸搬运分区协调策略. 运筹与管理, 2016,25(2): 242-251. (CSSCI, 影响因子: 1.150)