第一作者或通讯作者
Fang, Z., Liu, Y.*, Lu, Q., Pitt, M., Hanna, S., & Tian, Z. (2022). BIM-integrated portfolio-based strategic asset data quality management. Automation in Construction, 134, 104070.
Liu, Y., Houwing, E. J., Hertogh, M., Yuan, Z., & Liu, H. (2022). Explorative Learning in Infrastructure Development Megaprojects: The Case of the Hong Kong-Zhuhai-Macao Bridge. Project Management Journal, 53(2), 113-127
Chen, X., He, Q., Zhang, X., Cao,T., & Liu, Y.*. (2021). What motivates stakeholders to engage in collaborative innovation in the infrastructure megaprojects?. Journal of Civil Engineering and Management,27(8), 579-594.
Zeng, N., Liu, Y.*, Gong, P., Hertogh, M.,& König, M. (2021). Do right PLS and do PLS right: A critical review of the application of PLS-SEM in construction management research. Frontiers of Engineering Management, 8(3),356-369.
Zhang, X., Le, Y., Liu, Y.*, Chen, X. (2021).Fostering Ambidextrous Innovation Strategies in Large Infrastructure Projects: A Team Heterogeneity Perspective. IEEE Transactions on Engineering Management, 70(6), 2257-2267.
Liu, Y., Amini-Abyaneh, A., Hertogh, M., Houwing, E. J., & Bakker, H.(2021). Collaborate to learn and learn to collaborate: a case of exploitative learning in the inter-organizational project. Engineering, Construction and Architectural Management, 28(3), 809-830.
Liu, Y., van Marrewijk, A., Houwing, E.J., & Hertogh, M. (2019). The co-creation of values-in-use at the front end of infrastructure development programs.International journal of project management, 37(5), 684-695.
Liu, H., Jiang, C., Liu, Y.*, Hertogh, M.,& Lyu, X.(2018). Optimism Bias Evaluation and Decision-Making Risk Forecast on Bridge Project Cost Based on Reference Class Forecasting: Evidence from China. Sustainability, 10(11), 3981.
Zeng, N., Liu, Y.*, Mao,C., & König, M. (2018). Investigating the relationship between construction supply chain integration and sustainable use of material: Evidence from China. Sustainability,10(10), 3581.
Liu, Y., van Nederveen, S., Wu, C., & Hertogh, M. (2018). Sustainable Infrastructure Design Framework through Integration of Rating Systems and Building Information Modeling. Advances in Civil Engineering, 2018.
Liu, Y., Van Nederveen, S., & Hertogh, M. (2017). Understanding effects of BIM on collaborative design and construction: An empirical study in China.International Journal of Project Management, 35(4), 686-698.(ESI Highly Cited Paper)
刘琰,& 李世蓉. (2014). 虚拟建造在工程项目施工阶段中的应用及其 4D/5DLOD 研究. 施工技术,(3),62-66.
共同作者(部分)
Zeng, N., Ye, X., Liu, Y. & König, M. (2023), BIM-enabled Kanban system in construction logistics for real-time demand reporting and pull replenishment, Engineering, Construction and Architectural Management, Vol. ahead-of-print No. ahead-of-print.
Zeng, N., Liu, Y., & König, M. (2023). 4D BIM-Enabled Look-Ahead Scheduling for Early Warning of Off-Site Supply Chain Disruptions. Journal of Construction Engineering and Management, 149(1), 04022154.
Wang, J., Zhang, S., Fenn, P.,Luo, X., Liu, Y., & Zhao, L. (2023). Adopting BIM to Facilitate Dispute Management in the Construction Industry: A Conceptual Framework Development. Journal of Construction Engineering and Management, 149(1), 03122010.
Ninan, J., Hertogh, M., & Liu, Y. (2022). Educating engineers of the future: T-shaped professionals for managing infrastructure projects. Project Leadership and Society, 100071.
Zhang, X., Le, Y., Liu, Y., & Liu, M. (2021). Fostering ambidextrous innovation in infrastructure projects: differentiation and integration tactics of cross-functional teams. Journal of Construction Engineering and Management, 147(6), 04021046.
Wang, J., Sun, W., Shou, W., Wang, X., Wu, C., Chong, H.-Y., Liu, Y., & Sun, C. (2015). Integrating BIM and LiDAR for real-time construction quality control. Journal of Intelligent & Robotic Systems, 79(3), 417-432.
曾凝霜,刘琰,&徐波.(2015).基于 BIM 的智慧工地管理体系框架研究.施工技术,(10),96-100.(CNKI高被引论文)