1.Ding X , Qian LI* . Optimal riskallocation in alliance infrastructure projects: A social preference perspective[J]. Frontiers of Engineering Management,2022, 9(2):11.(ESCI)
2. Zhao, N., Chong, H. Y., Li, Q.* .Agent-based modelling of helping behaviour diffusionin project teams as anevolutionary process. Journal of Simulation,2022, 1-18.(SCI,JCR:Q2)
3.Li, Q.; Lee, C.-Y.; Jin,H.; Chong, H.-Y. Effects between Information Sharing and Knowledge Formationand Their Impact on Complex Infrastructure Projects’ Performance. Buildings 2022, 12,1201.(SCI,JCR:Q2)
4.Li,Q., Chong, H.Y.,Lee, C. Y.etc.BIM’s Formal and Informal Collaborative Networks in Traditional Procurement:Insights from the Construction Phase of a Hospital Case Study.Journal ofManagement in Engineering,2021,37(6), 05021008(SSCI,SCI,JCR:Q1)
5.Li, Q. , Sun, Q., Tao, S. , & X Gao.. Multi-skill projectscheduling with skill evolution and cooperation effectiveness. EngineeringConstruction & Architectural Management.2020,27(8)8: 2023-2045(SSCI,SCI,JCR:Q2)
6.Lee, C. Y ,Chong, H. Y. Li, Q.* ,& Wang,X.. Jointcontract-function effects on bim-enabled epc project performance.Journal of Construction Engineering and Management, 2020,146(3),04020008.1-04020008.14.(SSCI,SCI,JCR:Q1)
7.Yan X ,Chong H Y ,Zhou J , Li Q*. ConcessionModel for Fair Distribution of Benefits and Risksin Build-Operate-Transfer RoadProjects[J]. Journal of Civil Engineering andManagement,2019,25: 265-275.(SCI,JCR:Q2)
8.Zhu J, Fang M, Shi Q, Li Q* Contractorcooperation mechanism and evolution of the greensupply chain in megaprojects[J]. Sustainability, 2018, 10(11): 4306.(SCI,SSCI,JCR:Q2)
9. Zhu Y , Shi Q , Qian LI* , et al.Decision-making governance for the Hong Kong-Zhuhai-Macao Bridge in China[J].Frontiers of Engineering Management, 2018, 5(1):30-39. (ESCI)
10.Li, Q., Tao, S., Chong,H. Y., & Dong, Z. S. Robust optimization for integrated constructionscheduling and multiscale resource allocation.Complexity.
2018(SCI,SSCI,JCR:Q1)
11.Qian Li, heap-yihchong,Zhimei Yin, Qianqian Shi*. Nexusof Inter-Organizational Trust,Principled Negotiation, and Joint Action forImproved Cost Performance: Surveyof Chinese Megaprojects, Journal of Management in Engineering.(SSCI,SCI,JCR:Q1)
12.Qianqian Shi, Jianbo Zhu,Qian Li*. CooperativeEvolutionary Gameand Applications in Construction Supplier Tendency,Complexity, Article ID8401813, 13 pages, 2018. doi:10.1155/2018/8401813.(SCI,SSCI,JCR:Q1,2019高被引论文)
13.李迁,朱永灵,刘慧敏,程书萍.港珠澳大桥决策治理体系:原理与实务[J].管理世界,2019,35(04):52-60+159.(中文一流期刊)
14.盛昭瀚,程书萍,李迁,李敬泉,陈永泰,徐峰.重大工程决策治理的“中国之治”[J].管理世界,2020,36(06):202-212+254.(中文一流期刊)
15.袁竞峰,尚东浩,邱作舟,李迁.不同回报机制下PPP项目社会风险涌现机理研究[J].系统工程理论与实践,2020,40(02):484-498.(CSSCI,基金委重要期刊)
16.刘刚,李迁.工程社会化背景下港珠澳大桥营运管理的特性及相应实践[J].中国港湾建设,2021,41(04):72-76.
17.李迁,陶莎,周晓园,盛昭瀚.考虑作业空间干涉的工程项目时间-成本均衡优化研究[J].中国管理科学,2019,27(10):170-178.(CSSCI,基金委重要期刊)
18.李迁,武雨欣,胡毅,盛昭瀚,高星林.多重制度逻辑视角下重大工程组织模式多样性分析[J].科学决策,2019(11):49-65. (CSSCI)
19.李迁,姜霞,盛昭瀚.团队信任、共享领导力与新产品开发创新绩效关系[J].科研管理,2019,40(12):292-300. (CSSCI,基金委重要期刊)
20.李迁,李孟,盛昭瀚.项目成员关系网络结构对其影响力接受的跨层次研究[J].财贸研究,2019,30(12):95-105. (CSSCI)
21.李迁,马骢,赵楠.供应链中社会资本、不确定性与机会主义行为关系的实证研究[J].系统管理学报,2019,28(05):793-801. (CSSCI,基金委重要期刊)
22.李迁, 张怀明, 丁翔. 基于计算实验的资源受限多项目调度策略优化[J]. 系统管理学报, 2018(1). (CSSCI,基金委重要期刊)
23.Ding, X., Li, Q., Sheng,Z.H., Wang Z.Y., Linking transformational leadershipand work outcomes intemporary organizations: A social identity approach”.International Journal ofProject Management[J]. (SSCI)
24.Ding,Xiang、Sheng, Zhaohan、Du, Jianguo、Li, Qian* ,Computational Experiment Study on SelectionMechanism of ProjectDelivery Method Based on Complex Factors ,MathematicalProblems in Engineering,8卷, 2014/8 ,SCI.
25.李迁,李真,孟庆峰,盛昭瀚 ,基于多承包商资源共享的混凝土拌合站的动态配置研究 ,预测, 32(02), pp 49-54, 2013/3/27 . (CSSCI,基金委重要期刊)
26.李迁,丁翔 ,基于计算实验的供应链联盟形成机制研究 ,管理学报, 10(07), pp 1060-1064, 2013/7/1. (CSSCI,基金委重要期刊)
27.李迁、丁翔、于文 ,基于计算实验的工程承发包模式选择机理分析 ,华东经济管理, 27(08), pp 165-170, 2013/8/1. (CSSCI)
28.李迁,张劲文,李真 ,DB模式下大型工程设计方案更改的Stackelberg博弈模型分析 ,系统工程, 31(06), pp 72-77, 2013/6/28 . (CSSCI)
29.李迁,丁翔 ,大型工程设计咨询审查中的合谋行为及审计策略 ,审计与经济研究, 04期, pp 51-58, 2013/6 . (CSSCI)
30.李迁,刘亚敏 ,基于广义随机Petri网的工程突发事故应急处置流程建模及效能分析 ,系统管理学报, 22(02), pp 162-167+176, 2013/3/15.(CSSCI)
31.李迁、盛昭瀚 ,大型工程决策的适应性思维及其决策管理模式 ,现代经济探讨, 21(08), pp 47-51, 2013/8/15. (CSSCI)
32.李迁、陈荣虎 ,动态随机一般均衡模型微观基础分析及其改进 ,南京社会科学, 20(02), pp 30-34+42, 2013/2/15 . (CSSCI)
33.李迁,游庆仲等.大型建设工程的技术创新系统研究[J].科学学与科学技术管理,2006, 12. (CSSCI)
34.李迁.大型工程管理中的复杂性决策及决策管理——以苏通大桥为例[C],两型社会进程中的工程管理——第二届中国工程管理坛论文集,2008.
35.李迁,李江涛,盛昭瀚. 大型工程建设管理的方法论体系研究[J].科学决策, 2009,1. (CSSCI)
36.DingXiang; Li qian ,Study onPartnerSelection Method for Construction Supply Chain Using Tabu-SearchAlgorithm,Information Management, Innovation Management and IndustrialEngineering(ICIII), 2012 International Conference on, 2012/10/20-2012/10/21, pp122-125,2012/10/20 ,EI.
37.Kwan-ChewNg,Jing Li, Chen-Xi Shi,and Qian Li. Anoptimization model of Site Batch Plant Layout forInfrastructure Project[C]. The2010 International Conference on ArtificialIntelligence and ComputationalIntelligence (AICI'10),2010.EI,ISTP.
38.丁翔,陈永泰,盛昭瀚,李迁.基于FS模型的设计施工总承包联合体领导-成员风险分配策略分析[J].中国管理科学, 2016,24(7): 43-53 (CSSCI,基金委重要期刊)
39.盛昭瀚,游庆仲,李迁.大型复杂工程管理的方法论和方法:综合集成管理[J].科技进步与对策,2008.10(CSSCI)
40.李真,程书萍,李迁,孟庆峰. 工程质量优化的收益共享激励效率演化[J].运筹与管理, 2013.1. (CSSCI)
41.李真、孟庆峰、盛昭瀚、李迁 ,工程质量优化的承包商群体激励效率演化分析 ,中国管理科学, 03期,pp112-121, 2012/6/15 . (CSSCI,基金委重要期刊)
42.刘亚敏,周晶,李迁.大型工程突发事件形成机理的复杂性研究[J].复杂系统与复杂性科学,2010,2.
43.程书萍,王茜, 李迁. 关于综合集成管理职能的探索[J].科学决策,2009,1. (CSSCI)
44.李迁、高星林、王茜 ,大型工程建设的重大决策机制及组织管理 ,人民交通出版社, 2013/8,书/著作.
45.盛昭瀚、张劲文、李迁 ,基于计算实验的工程供应链管理 ,上海三联书店出版社, 2013/4 ,书/著作.
46.李迁、刘世同.高速公路现代工程管理理论与实务.南京大学出版社,2016.
47.何平、李迁.江苏省高速公路项目管理标准化指南.人民交通出版社,2016.